- UNET Model of Indian and Banana Rivers used to Determine Variable for Scour Analysis
- High-level bridge replacement for westbound bridge.
- $30.4 million construction cost.
- Utilizing pressure meter test data to obtain site- specific soil information as a test case for the Department.
- Substructure designed for 2,750k ship impact load.
- 161' simple main span utilized to provide 125' horizontal clearance.
- LRFD Design.
|
- Client:
FDOT District 5
- Construction Cost: $30,397,000.00
|
|
|
|